I know it’s crazy to try to get some of this stuff done before Sunday, but DD has been SO patient and looked so forward to having her room remodeled, that we want to see what we can finish before the open house. The carpenter told us he could have the bed done in time, so we are hoping that turns out to be so!
DH has been painting the room for the past several days. A little more work on the woodwork and the painting will be done.
The lime green is in a small indention in the wall. Her desk will be placed in front of this window. The closet to the right will be removed after Christmas and a new closet will be built to the right of the door to the room (which is where I was standing when I took the picture).
The carpenter is building a two story bed nook (the ceiling is 12′). The upper story will be a second bed for company, as well as a library nook for DD. The bed will have walls, windows, and steps up to the upper part. Each bed will have a ledge for a clock, a lamp, etc. Gary wired the outlets for us last week. Above the ledge will be shelves for books, display, etc.
I’m looking forward to posting pictures of this room when it is completed!
~~Rhonda